Image 13

Delayed coker unit, Rijeka Oil Refinery (RNR)

Image 13
Investor
INA - Oil Industry d.d.
Main project designer
Emil Rohlik, M.Arch.
Project designers

Emil Rohlik, M.Arch.
Ana Novak, M.Eng.M.E.
Željka Hitrec, M.Eng.E.E.
Marko Kitić, M.Eng.E.E.

Associate project designers

Ana Alar, Dipl.Eng.Arch.
Ivana Knez, Dipl.Eng.Arch.
Martina Stjepandić, M.Arch
Nika Nevečerel, M.Eng.M.E.

Location
Kostrena
Year of design / construction
2018
Total area
14.410 m²
Estimated costs
HRK 250.000.000,00
Transport, storage and loading of coke in an enclosed conveyor belt system is part of the Rijeka Oil Refinery facility. The location, dimensions and design of buildings and infrastructure are defined by the technological process, the spatial possibilities on the embankment at the port and strong environmental protection measures. The building for employees and the transport system “hovering” above the plant are shaped as oval cross-section tubes, reducing the impact of wind.
Image 107 Image 108 Image 109 Image 110 Image 111 Image 112 Image 113 Image 114