Investor
INA - Oil Industry d.d.
Main project designer
Nika Nevečerel, M.Eng.M.E., Ljubomir Radojčić, B.Sc.Mech.Eng.
Project designers
Nika Nevečerel, M.Eng.M.E.
Ana Novak, M.Eng.M.E.
Željka Hitrec, M.Eng.E.E.
Location
Zagreb, Virovitica-Podravina, Križevci-Koprivnica
Year of design / construction
2014 - 2017
Measurement and control projects in mechanical and process engineering and electrotechnical engineering have been made for mining facilities and plants. The Gola-10 consists of a borehole, power line and signal cable. The connecting pipeline of the Žutica 76 well is used for gas transportation to the connection to the Žutica 21 gas pipeline in the length of 968.63 m. In addition, a collection and shipping system for the use of a well with the oil production of 11 m³ / day has been fully defined in the Cabuna 3 well-field.
For KONZALT ING d.o.o.